Pre-Engineered Buildings (PEB) & Heavy Fabrication
Warehouse Structures
Warehouse structures designed around the racking, the material flow and the loading bays — not around a standard bay that the storage layout then has to accommodate.
A warehouse is designed from the racking outwards.
The expensive mistake in a warehouse is designing the building first and fitting the racking into it. Bay spacing that does not suit the rack pitch wastes floor area on every single run, permanently. We start from the storage layout and the material flow — rack pitch, aisle width, turning circles, dock height — and set the structural grid to serve them.
The rest follows: clear height set by the rack height plus the sprinkler and lighting zone, loading elevations set by the vehicle, and a roof and drainage design that suits a building nobody wants to work on once it is full.
Designed Around the Racking
Loading Bay Integration
Clear Height to Rack + Services
Fabricated & Erected In-House
Warehouse Roof Framing
What we make
What we manufacture and deliver.
Any one of these can be contracted on its own, or the whole interior delivered under a single award against one drawing set and one schedule. Everything listed is manufactured, supplied and installed by us — not sub-let after award.
Warehouse Frames
The primary structure, with the grid set by the storage layout rather than by a default bay.
Structural grid set from the rack pitch
Clear height to rack top plus services zone
Designed to IS 800 with loads to IS 875
Future extension allowed for where required
Storage Bays
Internal bays laid out to the aisle widths and turning circles the handling equipment needs.
Aisle widths to the handling equipment
Column positions clear of rack runs
Turning and staging areas allowed for
Laid out from the storage plan you send
Roof Framing & Services Zone
Roof structure detailed to carry the services a warehouse actually hangs from it.
Roof framing and purlin design
Provision for sprinkler and lighting runs
Ventilation and roof lights where specified
Rainwater goods sized to the roof area
Loading Elevations
The face of the building where vehicles meet it — the detail that decides how the warehouse operates.
Dock and loading bay openings
Levels set to the vehicle bed height
Canopy and weather protection where specified
Door openings sized to the handling equipment
Warehouse Interior Bay
Standards & compliance
Built to the standards this work is inspected against.
Wording here is deliberate: we design and manufacture to these criteria.
Steel designIS 800:2007, as the design basis issued with the tender.
LoadingIS 875 Parts 1 to 5, including wind loading to the site zone.
SeismicIS 1893, to the zone for your site.
MaterialIS 2062 hot-rolled structural steel, grade as specified.
Scope notethe codes above are the design and fabrication basis this work is engineered and inspected to. They are not third-party certification of it. Our ISO 9001, ISO 13485 and ISO 50001 certificates are scoped to furniture manufacture and do not extend to structural steel; MSME ZED Gold and the Lean certification are plant-level and do. Every certificate and its scope is published on our certifications page.
Warehouse Storage Bay
Certificates held
Not what we design to — what we are audited for.
The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.
Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.
ISO 9001Quality managementBSCIC Certifications Pvt. Ltd. · BN22475/21523 Rev.01
ISO 45001Occupational health & safety
ISO 14001Environmental management
ZED GoldZero Defect Zero Effect — GoldMinistry of MSME · assessed by Conformity India International Pvt. Ltd. · 14072025_402233
MSME LeanLean manufacturing, basic levelMinistry of MSME · LB_20250721_16579
Design, fabrication and site erection under one contract. The alternative is a fabricator, an erector and an argument about which of them owns a misaligned bay.
02
Fabricated in our own plants
Cutting, forming, welding and finishing happen across our two plants in Dindori, Nashik — more than 1,00,000 sq. ft. — so nothing waits on an outside vendor between stages.
03
Designed to the code set you issue
The load cases, the design code and the site conditions come with your drawing set, and we engineer to what is issued rather than to a house standard.
04
Honest about certificate scope
Our ISO certificates are scoped to furniture, and we say so on this page rather than letting a badge imply cover it does not have. What applies here is stated per page.
FAQ
Questions we get on this scope.
If yours is not here, ask — we would rather answer it properly.
Yes, and it is the single most useful thing you can do before tendering. Bay spacing that does not suit the rack pitch wastes floor area on every run for the life of the building. Send the racking layout — or the pallet count, the rack type and the handling equipment — and the structural grid will be set to serve it.
The design basis comes with the tender — the load cases, the governing code and the site conditions are issued with the drawing set and we engineer to what is issued. In India that is normally IS 800 for the steel design, IS 875 Parts 1 to 5 for dead, imposed, wind and snow loads, IS 1893 for seismic, and IS 2062 for the plate and section material. If you want the codes and load assumptions confirmed for a specific enquiry before you shortlist us, ask and we will state them in writing for that scope.
Rack top height plus the services zone above it — sprinklers, lighting and any conveyor. That is usually more than people allow for, and it cannot be added later. Tell us the rack height and whether the building is sprinklered and we will set the eave height from it.
Yes, if it is designed for phasing from the start. Gable framing, bracing and the foundation at the future extension line all change if a second phase is coming. Say so at design stage and phase two is a straightforward extension; say so afterwards and it is a rebuild of the end bay.
Send the drawing set, the bill of quantities or the tender document. You get back a priced scope and a dated programme against your milestones, and we will tell you plainly if any part of the scope is outside what we manufacture rather than quoting it and buying it in later.
Send us the drawing.
A tender number, a specification or a drawing set — we will confirm what we can build and by when, within two working days.