Power Distribution
LT and HT lines, transformers, panels and earthing.
- Power distribution — LT/HT lines, transformers, panels and earthing.

Ministry of Railway
Power, water, drainage, lighting and allied utility infrastructure for railway and metro depots, workshops and corridors — delivered alongside civil and structural scope, so every facility is fully serviced and operational on handover.
Service information
A depot or workshop is only useful when it is fully serviced. Finex delivers the complete utility layer — LT/HT power distribution with transformers, panels and earthing; water supply, plumbing, coach-washing lines and pumping; storm-water and effluent drainage with ETP readiness.
Yard, platform and building lighting, compressed-air lines, network/control cabinets and track-side office cabins complete the scope — coordinated with civil, structural and workshop packages under one integrated contract.

What we make
Any one of these can be contracted on its own, or the whole interior delivered under a single award against one drawing set and one schedule. Everything listed is manufactured, supplied and installed by us — not sub-let after award.
LT and HT lines, transformers, panels and earthing.
Supply, plumbing, coach-washing lines and pumping.
Storm-water and effluent drainage, with sewage and ETP readiness.
Yard and platform lighting, compressed air, and track-side cabins.
Standards & compliance
Wording here is deliberate: we design and manufacture to these criteria.

Certificates held
The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.
Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.
Why Finex
Manufactured against RDSO specifications and the approved IR / ICF / LHB drawing set.
More than 1,00,000 sq. ft. across two units near Nashik — fabrication, finishing and assembly in house.
One contract, one schedule, one name on the handover certificate.
Delivery, installation and site support anywhere in the country.
FAQ
If yours is not here, ask — we would rather answer it properly.
LT/HT power distribution with transformers, panels and earthing; water supply, plumbing, coach-washing lines and pumping; storm-water and effluent drainage with ETP readiness; yard, platform and building lighting; compressed-air lines; and network/control cabinets with track-side office cabins.
Electricals follow CEA regulations, IS codes and NBC 2016; lighting follows IS 3646 / NBC; water, drainage and plumbing follow IS/NBC services codes.
Yes — utility packages are coordinated with civil, structural and workshop scope under integrated contracts, so the facility is fully serviced and operational on handover.
Yes — coach-washing lines with water supply, pumping and drainage are a standard part of Finex depot utility scope.
Call
A tender number, a specification or a drawing set — we will confirm what we can build and by when, within two working days.