Gut No. 243/1B, Pimpalnare, Dindori, Nashik, Maharashtra – 422004
Pre-Engineered Buildings (PEB) & Heavy Fabrication
Customised Industrial Platforms
Mezzanine floors, access platforms, walkways, staircases and handrails — designed to the load that will actually be on them and fabricated in our own plants.
A platform is only as good as the load case behind it.
Mezzanines and access platforms are where imposed-load assumptions get quietly optimistic — a storage mezzanine designed for foot traffic, a walkway that was never checked for the pallet truck that now uses it. We ask what actually goes on the platform before designing it, and we design to that rather than to a general-purpose figure.
Handrails, toe boards and staircases are part of the same scope, not an afterthought bolted on later. All of it fabricated across our Nashik plants and erected by us, so the platform arrives as a system rather than as parts to be reconciled on site.
Mezzanine Floors
Walkways & Staircases
Handrails & Toe Boards
Designed to Imposed Load
Access Platform & Railing
What we make
What we manufacture and deliver.
Any one of these can be contracted on its own, or the whole interior delivered under a single award against one drawing set and one schedule. Everything listed is manufactured, supplied and installed by us — not sub-let after award.
Mezzanine Floors
Structural mezzanines that add usable floor area within an existing building envelope.
Designed to the imposed load you specify
Column grid set clear of the operation below
Decking specified to the use
Loads to the existing floor checked at design stage
Access Platforms
Elevated working and maintenance platforms around plant and equipment.
Maintenance and operating platforms
Access to plant and equipment
Handrail and toe board to the platform edge
Fabricated to suit the equipment layout
Walkways & Gantries
Connecting routes at height, sized for the traffic they will actually carry.
Elevated walkways and crossovers
Grating or plate decking
Designed for the traffic and any equipment carried
Handrails both sides as standard
Staircases & Handrails
The access itself — stairs, landings and handrails, part of the platform scope rather than a later addition.
Staircases and intermediate landings
Handrails and toe boards
Rise and going set to the access requirement
Supplied and erected with the platform
Mezzanine Floor & Handrail
Standards & compliance
Built to the standards this work is inspected against.
Wording here is deliberate: we design and manufacture to these criteria.
Steel designIS 800:2007, to the imposed load case agreed for the platform.
LoadingIS 875 Part 2 — imposed loads, set from what the platform will actually carry.
SeismicIS 1893, where the structure and the site require it.
MaterialIS 2062 hot-rolled structural steel, grade as specified.
Scope notethe codes above are the design and fabrication basis this work is engineered and inspected to. They are not third-party certification of it. Our ISO 9001, ISO 13485 and ISO 50001 certificates are scoped to furniture manufacture and do not extend to structural steel; MSME ZED Gold and the Lean certification are plant-level and do. Every certificate and its scope is published on our certifications page.
Warehouse Working Platform
Certificates held
Not what we design to — what we are audited for.
The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.
Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.
ISO 9001Quality managementBSCIC Certifications Pvt. Ltd. · BN22475/21523 Rev.01
ISO 45001Occupational health & safety
ISO 14001Environmental management
ZED GoldZero Defect Zero Effect — GoldMinistry of MSME · assessed by Conformity India International Pvt. Ltd. · 14072025_402233
MSME LeanLean manufacturing, basic levelMinistry of MSME · LB_20250721_16579
Design, fabrication and site erection under one contract. The alternative is a fabricator, an erector and an argument about which of them owns a misaligned bay.
02
Fabricated in our own plants
Cutting, forming, welding and finishing happen across our two plants in Dindori, Nashik — more than 1,00,000 sq. ft. — so nothing waits on an outside vendor between stages.
03
Designed to the code set you issue
The load cases, the design code and the site conditions come with your drawing set, and we engineer to what is issued rather than to a house standard.
04
Honest about certificate scope
Our ISO certificates are scoped to furniture, and we say so on this page rather than letting a badge imply cover it does not have. What applies here is stated per page.
FAQ
Questions we get on this scope.
If yours is not here, ask — we would rather answer it properly.
To what you tell us is going on it — that is the whole question. A storage mezzanine, an office mezzanine and a plant maintenance platform are three different load cases and it is not safe to guess between them. Tell us the use, the heaviest thing that will be on the floor and whether a pallet truck or trolley will run on it, and the design follows from that.
Usually, and the constraint is normally the existing floor rather than the mezzanine. The column loads have to go somewhere, so the existing slab and foundation need checking at design stage. Send what you know about the existing construction and we will tell you what needs verifying before anything is fabricated.
Yes — they are part of this scope, not a separate order. A platform delivered without its access and edge protection is not a platform anyone can use, and splitting them across two suppliers is how the interface ends up wrong.
The design basis comes with the tender — the load cases, the governing code and the site conditions are issued with the drawing set and we engineer to what is issued. In India that is normally IS 800 for the steel design, IS 875 Parts 1 to 5 for dead, imposed, wind and snow loads, IS 1893 for seismic, and IS 2062 for the plate and section material. If you want the codes and load assumptions confirmed for a specific enquiry before you shortlist us, ask and we will state them in writing for that scope.
Send the drawing set, the bill of quantities or the tender document. You get back a priced scope and a dated programme against your milestones, and we will tell you plainly if any part of the scope is outside what we manufacture rather than quoting it and buying it in later.
Send us the drawing.
A tender number, a specification or a drawing set — we will confirm what we can build and by when, within two working days.