A government office building of the kind Finex Industries delivers turnkey

Service line 07 of 07

One Contract. One Schedule. One Signature at Handover.

Single-contract delivery from drawing and approval to installation and handover.

Finex Industries at a glance

Government Turnkey Projects

What this covers.

Turnkey is the reason Finex exists. When the steel, the interiors and the civil work come from one organisation, there is one drawing set, one schedule and one name on the handover certificate — and no gap between vendors for a project to fall into.

Everything on this page can be delivered on its own or folded into a single turnkey contract alongside our other service lines — one drawing set, one schedule and one signature at handover.

Public Housing Block — Government Turnkey Projects
Public Housing Block

Scope

What we deliver.

Manufactured, supplied and installed by us against the approved drawing set for your contract — not sub-let to a third party after award.

  • 01

    Tender documentation and technical submissions

  • 02

    Design, drawings and departmental approvals

  • 03

    Manufacture across all three disciplines

  • 04

    Civil, electrical and mechanical coordination

  • 05

    Site execution and installation

  • 06

    Commissioning, documentation and handover

Road Works

How it gets built

From requirement to delivery.

The same four stages on every contract, so you always know what has been approved, what is in the plant and what is still open.

  1. 01

    Understand the Requirement

    We begin by understanding the project requirements, site conditions, specifications and expected outcomes before moving into execution.

  2. 02

    Design & Plan

    Drawings, materials, specifications and execution plans are developed and reviewed to establish a clear path from concept to manufacturing.

  3. 03

    Manufacture & Execute

    Fabrication and manufacturing are carried out at our facilities with quality checks at key stages, followed by controlled site execution.

  4. 04

    Deliver & Handover

    Installation, commissioning, testing and documentation are completed before final handover, with support through project completion.

Certificates held

Not what we design to — what we are audited for.

The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.

Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.

  • ISO 9001 Quality management BSCIC Certifications Pvt. Ltd. · BN22475/21523 Rev.01
  • ISO 14001 Environmental management
  • ISO 45001 Occupational health & safety
  • ISO 50001 Energy management IRQS · IRQS/251000616
  • ZED Gold Zero Defect Zero Effect — Gold Ministry of MSME · assessed by Conformity India International Pvt. Ltd. · 14072025_402233
All 20 certificates, with issuing bodies and validity dates

Questions

What buyers ask us first.

Tender documentation and technical submissions, design, drawings and departmental approvals, manufacture across all three disciplines, civil, electrical and mechanical coordination, site execution and installation, and commissioning, documentation and handover. Two sub-service areas sit under it: civil construction, and project management consultancy.

That is the reason the organisation is built the way it is. Fabrication, furniture and construction all run from our own two plants in Dindori, Nashik, totalling more than 1,00,000 sq. ft., so a department can place one contract instead of three and get one drawing set, one schedule and one signature on the handover certificate.

Yes — project management consultancy has its own page and can be contracted on its own. Most of our work is the other shape, where we manage a project we are also manufacturing for, but the two are separable and we will say which one a given enquiry actually needs.

The drawings and technical submissions made for the tender and revised through the approval cycle, stage records from the plant, and the commissioning and handover documentation at the end. What we hand over is fixed in the contract, and we would rather agree the document list before award than negotiate it at handover.

Not by name on this website, and for a reason. Most of our work is for government departments and naming a buyer needs their written consent, which we are collecting. If you are evaluating us for a tender today, ask: we will send relevant references, drawings and certificates directly rather than publishing them.

Need Government Turnkey Projects?

Tell us the scope and the deadline. If it is something we build, you will get a straight answer and a realistic date.

Call Now WhatsApp