Ward & Clinical Areas
The rooms the hospital is judged on, built and fitted out as one scope.
- Ward blocks, consulting cabins and clinical rooms — partitions, doors, flooring, ceilings and joinery.

Ministry of Health
Complete hospital blocks — clinical areas, support departments and the circulation between them — built, fitted out and handed over as one contract.
Service information
A hospital only functions when the support departments work as well as the clinical ones. We build and fit out the whole envelope: entrance and corridors, consulting cabins, laboratories, meeting rooms, kitchens and canteens, changing rooms, washrooms, stores, housekeeping, security and mortuary.
Partition systems, doors, flooring, ceilings, joinery and the furniture that goes into each room are manufactured in our own plants, so the fit-out is scheduled against the civil programme rather than chased separately after it.

What we make
Any one of these can be contracted on its own, or the whole interior delivered under a single award against one drawing set and one schedule. Everything listed is manufactured, supplied and installed by us — not sub-let after award.
The rooms the hospital is judged on, built and fitted out as one scope.
Rooms whose finishes have to survive daily chemical cleaning.
The departments that decide whether the clinical areas can actually function.
Catering areas including the stainless-steel counters and service furniture.
Everything between the front door and the ward door.
Sanitary blocks and drinking-water provision through the building.
The rooms most fit-out packages leave until last.
Site circulation and external works around the block.
Standards & compliance
Wording here is deliberate: we design and manufacture to these criteria.

Certificates held
The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.
Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.
Why Finex
More than 1,00,000 sq. ft. across two units near Nashik. Fabrication, finishing and assembly stay under our control rather than being sub-let after award.
Civil, furniture, gas lines and fire systems can run under a single order — one schedule, one site team, one signature at handover.
Hospital work is measured and signed for. We build to the drawing and submit the supporting documentation with the bid rather than after it.
Supply, installation and site support anywhere in the country, from a plant that has been doing government work since 2009.
FAQ
If yours is not here, ask — we would rather answer it properly.
Both, depending on the contract. We take civil and structural scope as well as the internal fit-out, and either can be ordered on its own. Where we do both, the fit-out is scheduled against the civil programme rather than tendered separately afterwards.
Yes. Phased work in a live building is normal for us — we agree the sequence, the isolation and the working hours with the department before we start, so one wing stays in service while another is being handed over.
It can be. Beds, lockers, trolleys, cupboards and waiting furniture are manufactured in our own plants, so a modular hospital contract can include the furniture rather than leaving it to a second supplier and a second delivery date.
Our plants are at Gut No. 243/1B, Pimpalnare, Dindori, Nashik, Maharashtra – 422004. We deliver projects pan-India from there.
Send the tender number, the drawing set or a description of the requirement. We reply within two working days and tell you honestly whether it is ours to build.
A tender number, a specification or a drawing set — we will confirm what we can build and by when, within two working days.