Project Management Consultancy (PMC)
Design co-ordination, technical submissions, programme control, stage inspection and handover documentation — contracted on its own, or alongside work we are also delivering.
Most projects fail on co-ordination, not on construction.
The work that decides whether a government project lands on time is rarely the building itself. It is whether the submissions were made in the right format, whether the approval cycle was anticipated, whether the design conflicts were caught on paper, and whether the stage inspections happened when the programme assumed they would.
That is what this service is. It can be contracted on its own. Most of our work is the other shape — managing a project we are also manufacturing for — but the two are separable, and we will tell you which one your enquiry actually needs.
Design Co-ordination
Technical Submissions
Programme & Stage Control
Handover Documentation
Planning & Programme Review
What we make
What we manufacture and deliver.
Any one of these can be contracted on its own, or the whole interior delivered under a single award against one drawing set and one schedule. Everything listed is manufactured, supplied and installed by us — not sub-let after award.
Design Co-ordination
Catching the conflicts between disciplines on paper, which is the only cheap place to catch them.
Co-ordination across civil, structural and services
Design conflict identification before construction
Interface definition between packages
Review meetings through the design cycle
Technical Submissions & Approvals
Preparing what the department needs, in the format it needs, and carrying it through the revision cycle.
Technical submissions in the departmental format
Drawings prepared for approval
Revisions tracked through the approval cycle
Approval status maintained against the programme
Programme & Progress Control
A programme that reflects the approval cycle rather than assuming it away.
Programme built around the approval cycle
Progress measurement against milestones
Early warning where a date is at risk
Reporting in the format the department requires
Site Inspection & Handover
Stage inspection through execution, and the documentation pack that closes the project out.
Stage inspection through execution
Non-conformance identification and close-out
Commissioning support
As-built and handover documentation
Design Co-ordination Meeting
Standards & compliance
Built to the standards this work is inspected against.
Wording here is deliberate: we design and manufacture to these criteria.
MeasurementIS 1200 — method of measurement of building and civil engineering works.
Specification and ratesCPWD Specifications and the applicable CPWD or State Schedule of Rates, where the project is issued on them.
Building requirementsNational Building Code of India (NBC 2016), where it governs the work.
Concrete works under our supervisionIS 456.
Scope notethe codes above are the basis this work is executed and inspected to. They are not third-party certification of it. Our ISO 9001, ISO 13485 and ISO 50001 certificates are scoped to furniture manufacture and do not extend to civil construction; MSME ZED Gold and the Lean certification are plant-level. Every certificate and its scope is published on our certifications page.
Site Inspection Visit
Certificates held
Not what we design to — what we are audited for.
The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.
Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.
ISO 9001Quality managementBSCIC Certifications Pvt. Ltd. · BN22475/21523 Rev.01
ISO 14001Environmental management
ISO 45001Occupational health & safety
ISO 50001Energy managementIRQS · IRQS/251000616
ZED GoldZero Defect Zero Effect — GoldMinistry of MSME · assessed by Conformity India International Pvt. Ltd. · 14072025_402233
Fabrication, furniture and construction all run from our own two plants, so a department can place one contract and get one drawing set, one schedule and one signature on the handover certificate.
02
Documentation built for the department
Technical submissions, approval drawings and handover documentation prepared in the format the department works in, and revised through the approval cycle rather than assembled at the end.
03
The interfaces are written down
Where our scope starts and stops is fixed in the contract. Most turnkey disputes are interface disputes, and they are cheaper to settle on paper before award than on site after it.
04
Honest about what we hold
Our ISO certificates are scoped to furniture and we say so on these pages rather than letting a badge imply cover it does not have.
FAQ
Questions we get on this scope.
If yours is not here, ask — we would rather answer it properly.
Yes — it is offered as its own scope and is regularly taken that way. It is worth saying that most of our PMC work sits alongside manufacturing we are also doing, so if you want the consultancy genuinely independent of the delivery, say so at enquiry stage and we will confirm in writing that we are not tendering for the works.
A plan prepared at tender stage, revised and approved before execution starts, and then actually used — stage inspections at the points it names, records kept as the work proceeds, and non-conformances closed out rather than carried. A QAP written after award and filed unread is the common failure, and it is visible at handover.
Not by name on this website, and for a reason. Most of our work is for government departments, and naming a buyer needs their written consent — which we are in the process of collecting. If you are evaluating us for a tender today, ask: we will send relevant references, drawings and certificates directly rather than publishing them without permission.
We prepare and issue what the approval requires and carry it through the revision cycle. The approval itself is granted by the department. No consultancy can promise you an outcome that is in someone else’s gift, and one that does is telling you something about how it will handle the rest of the project.
Send the tender document, the bill of quantities or the drawing set. You get back a priced scope against your line items and a dated programme against your milestones, and we will say plainly if any part of the scope sits outside what we deliver rather than quoting it and sub-letting it after award.
Send us the drawing.
A tender number, a specification or a drawing set — we will confirm what we can build and by when, within two working days.