Gut No. 243/1B, Pimpalnare, Dindori, Nashik, Maharashtra – 422004
Government Turnkey Projects
Civil Construction
Institutional buildings, public housing, road and bridge works, water infrastructure and pipeline laying — executed as part of a single turnkey contract rather than split across suppliers.
Civil work is where a turnkey contract earns its keep.
On a government project the civil work is usually the piece that has to co-ordinate with everything else — the steel that lands on the foundation, the services that run through the slab, the fit-out that follows the handover. Splitting it from the rest is how programmes slip and how interfaces become disputes.
We deliver civil work as part of the same contract as the fabrication and the furniture, from our organisation in Dindori, Nashik. One drawing set, one schedule, and a defined boundary written into the contract rather than discovered at site.
Institutional & Public Buildings
Roads, Bridges & Water Works
Single-Contract Delivery
Departmental Documentation
Road Works
What we make
What we manufacture and deliver.
Any one of these can be contracted on its own, or the whole interior delivered under a single award against one drawing set and one schedule. Everything listed is manufactured, supplied and installed by us — not sub-let after award.
Institutional Buildings
Buildings for public institutions — the category that most often runs alongside our furniture and fabrication scope.
Institutional and departmental buildings
Co-ordinated with fit-out and furniture scope
Executed to the approved drawing set
Documentation prepared in the department’s format
Public Housing
Residential blocks delivered under public housing schemes.
Residential block construction
Repeatable unit layouts across a scheme
Services co-ordination through the structure
Stage records through execution
Roads & Bridges
Road works and bridge construction, including the approach and drainage work around them.
Road construction and surfacing
Bridge and culvert construction
Drainage and approach works
Executed to the issued specification
Water Infrastructure
Water treatment facilities, reservoirs and associated structures.
Water treatment facility structures
Reservoir and dam-associated works
Associated civil and structural work
Co-ordinated with mechanical scope where required
Pipeline & Utility Works
Pipeline laying and the trenching, bedding and reinstatement around it.
Pipeline laying and jointing
Trenching, bedding and backfill
Surface reinstatement
Route co-ordination with existing services
Ancillary Structures
The smaller structures a scheme needs and the main package often leaves out.
Kitchen sheds and service structures
Boundary and site works
Ancillary buildings within a scheme
Delivered on the main programme
Public Housing Block
Standards & compliance
Built to the standards this work is inspected against.
Wording here is deliberate: we design and manufacture to these criteria.
ConcreteIS 456 — plain and reinforced concrete, code of practice.
MeasurementIS 1200 — method of measurement of building and civil engineering works.
Building requirementsNational Building Code of India (NBC 2016), where it governs the work.
Specification and ratesCPWD Specifications and the applicable CPWD or State Schedule of Rates, where the tender is issued on them.
Steel design where the scope includes structural steel: IS 800:2007 with loads to IS 875.
Scope notethe codes above are the basis this work is executed and inspected to. They are not third-party certification of it. Our ISO 9001, ISO 13485 and ISO 50001 certificates are scoped to furniture manufacture and do not extend to civil construction; MSME ZED Gold and the Lean certification are plant-level. Every certificate and its scope is published on our certifications page.
Kitchen Shed Structure
Certificates held
Not what we design to — what we are audited for.
The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.
Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.
ISO 9001Quality managementBSCIC Certifications Pvt. Ltd. · BN22475/21523 Rev.01
ISO 14001Environmental management
ISO 45001Occupational health & safety
ISO 50001Energy managementIRQS · IRQS/251000616
ZED GoldZero Defect Zero Effect — GoldMinistry of MSME · assessed by Conformity India International Pvt. Ltd. · 14072025_402233
Fabrication, furniture and construction all run from our own two plants, so a department can place one contract and get one drawing set, one schedule and one signature on the handover certificate.
02
Documentation built for the department
Technical submissions, approval drawings and handover documentation prepared in the format the department works in, and revised through the approval cycle rather than assembled at the end.
03
The interfaces are written down
Where our scope starts and stops is fixed in the contract. Most turnkey disputes are interface disputes, and they are cheaper to settle on paper before award than on site after it.
04
Honest about what we hold
Our ISO certificates are scoped to furniture and we say so on these pages rather than letting a badge imply cover it does not have.
FAQ
Questions we get on this scope.
If yours is not here, ask — we would rather answer it properly.
Where the tender is issued on them, yes — CPWD Specifications and the applicable CPWD or State Schedule of Rates are the basis we price and execute against. Send the tender document and we will price against the schedule it names rather than against our own.
Because on most of our projects the civil work is not standing alone — it carries steel we fabricated and precedes fit-out we supply. Buying those from one organisation removes the interfaces where programmes usually slip. Where the civil work genuinely is standalone, a specialist may well be the better answer, and we will say so.
Not by name on this website, and for a reason. Most of our work is for government departments, and naming a buyer needs their written consent — which we are in the process of collecting. If you are evaluating us for a tender today, ask: we will send relevant references, drawings and certificates directly rather than publishing them without permission.
The technical submissions and drawings made for the tender and revised through the approval cycle, stage records through execution, and the commissioning and handover documentation at completion. What is in that pack is fixed in the contract — we would rather agree the document list before award than negotiate it at handover.
Send the tender document, the bill of quantities or the drawing set. You get back a priced scope against your line items and a dated programme against your milestones, and we will say plainly if any part of the scope sits outside what we deliver rather than quoting it and sub-letting it after award.
Send us the drawing.
A tender number, a specification or a drawing set — we will confirm what we can build and by when, within two working days.