Coach interiors — seats, berths, FRP modules and fit-out, to EN 45545-HL3

Service line 02 of 07
RDSO-Compliant Coach Interiors and Rail Infrastructure.
RDSO-compliant coach interiors — seating, FRP modules and fit-out — plus rail workshop infrastructure.
Finex Industries at a glance
- Since 2009 Delivering turnkey projects
- 1,00,000+ sq. ft. Across two plants
- 3 disciplines Fabrication, furniture, construction
- 20 certifications Quality and green standards
- Pan-India delivery Projects across the country
Ministry of Railway
What this covers.
Railway divisions buy to a drawing and a standard, and they inspect against both. We manufacture seat and berth systems to EN 45545-HL3 fire safety requirements and build the workshop, platform and depot infrastructure around them — so a division can place fewer contracts and still get one accountable delivery.
Everything on this page can be delivered on its own or folded into a single turnkey contract alongside our other service lines — one drawing set, one schedule and one signature at handover.

Scope
What we deliver.
Manufactured, supplied and installed by us against the approved drawing set for your contract — not sub-let to a third party after award.
01 02 Coach interior panels, fittings and fixtures
03 Railway workshop infrastructure
04 Platform and station utility structures
05 Depot and shed fabrication
06 Site installation and commissioning
In this service line
Each of these has its own specification page.
Scope, standards, the certificates that apply and the questions buyers ask — set out per product rather than summarised here.
Coach Solutions Seats and berths, executive chair-car seating, FRP toilet cabins, partition panelling, luggage racks and bio-tanks — high-strengt… View specification
Workshop Infrastructure Design, build and equipping of railway and metro maintenance workshops and depots — shed structures, inspection bays, pit lines… View specification
Civil Works Foundation-to-finish civil construction for railway buildings, platforms, foot-over-bridges, minor bridges, drainage and yard inf… View specification
EOT Crane Installation Erection, alignment, load-testing and commissioning of single-girder, double-girder and gantry EOT cranes for railway workshops… View specification
Utility & Infrastructure Development Power, water, drainage, lighting and allied utility infrastructure for railway and metro depots, workshops and corridors — delive… View specification
How it gets built
From requirement to delivery.
The same four stages on every contract, so you always know what has been approved, what is in the plant and what is still open.
01 Understand the Requirement
We begin by understanding the project requirements, site conditions, specifications and expected outcomes before moving into execution.
02 Design & Plan
Drawings, materials, specifications and execution plans are developed and reviewed to establish a clear path from concept to manufacturing.
03 Manufacture & Execute
Fabrication and manufacturing are carried out at our facilities with quality checks at key stages, followed by controlled site execution.
04 Deliver & Handover
Installation, commissioning, testing and documentation are completed before final handover, with support through project completion.
Certificates held
Not what we design to — what we are audited for.
The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.
Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.
- ISO 9001 Quality management
- ISO 45001 Occupational health & safety
- ISO 14001 Environmental management
- ISO 50001 Energy management
- ZED Gold Zero Defect Zero Effect — Gold
Questions
What buyers ask us first.
Coach interiors — seats, berths, FRP modules and fit-out — plus coach interior panels, fittings and fixtures; and separately the infrastructure around the coach: railway workshop infrastructure, platform and station utility structures, depot and shed fabrication, EOT crane installation, and site installation and commissioning. Five sub-service pages cover them in detail.
We manufacture to RDSO specifications and to EN 45545-HL3 fire safety requirements, and we say "to" deliberately — conformance to a specification and registration as an approved vendor are two different things, and buyers are right to check which one they are being offered. Send us the tender number and we will put our current registration position in writing before you spend any more time evaluating us.
That is the reason the organisation is built the way it is. Fabrication, furniture and construction all run from our own two plants in Dindori, Nashik, totalling more than 1,00,000 sq. ft., so a department can place one contract instead of three and get one drawing set, one schedule and one signature on the handover certificate.
ISO 9001 for quality management, ISO 14001 and ISO 45001 for environment and occupational safety, ISO 50001 for energy management, and MSME ZED Gold. They are management-system and process certificates, not rail-specific product approvals — we have not claimed otherwise, and where a tender requires a rail accreditation we will tell you our position on it in writing.
Send the drawing set, the bill of quantities or just the tender document. We come back with a priced scope and a dated programme against your milestones, and we will tell you plainly if any part of the scope is outside what we manufacture rather than quoting it and sub-letting it later.
Need Ministry of Railway?
Tell us the scope and the deadline. If it is something we build, you will get a straight answer and a realistic date.


