Gut No. 243/1B, Pimpalnare, Dindori, Nashik, Maharashtra – 422004
Ministry of Health
Medical Gas Pipeline Systems (MGPS) & HVAC
Oxygen, nitrous oxide and vacuum pipelines with their manifolds, alarms and outlets — installed, pressure-tested and commissioned alongside the hospital HVAC.
Medical gas is a life-safety system: the pipeline, the manifold, the alarm panel and the outlet at the bed head all have to be right, and all have to be provable at handover. We install the complete run — source, distribution, zone valves, alarms and terminal units — and pressure-test and purge it before commissioning.
Hospital air-conditioning is installed on the same contract where it is wanted: rooftop plant, ward and corridor ducting, and the diffusers and filtration a clinical area needs. Running both under one order means one team is accountable for the ceiling void instead of two trades working around each other.
IS 7396 / HTM 02-01
Pressure-Tested
Alarms & Zone Valves
HVAC Included
Nitrous Oxide Manifold
What we make
What we manufacture and deliver.
Any one of these can be contracted on its own, or the whole interior delivered under a single award against one drawing set and one schedule. Everything listed is manufactured, supplied and installed by us — not sub-let after award.
Medical Oxygen Supply
Manifold to bed-head outlet, with the control, testing and documentation that goes with it.
Medical oxygen supply — manifold, distribution pipeline, zone valves and bed-head outlets.
MGPS control and alarm panels with zone monitoring.
Copper pipework, brazing, pressure testing, purging and commissioning documentation.
Nitrous Oxide, Air & Vacuum
The other medical gas services, manifolded and piped on the same system.
Nitrous oxide, medical air and vacuum manifolds and pipeline runs.
Hospital HVAC Plant
Rooftop plant, air-handling units and chilled-water or DX distribution.
Hospital HVAC — rooftop plant, air-handling units and chilled-water or DX distribution.
Ducting & Air Distribution
Ward, corridor and theatre ducting with diffusers and filtration.
Ward, corridor and theatre ducting, diffusers and filtration.
Rooftop HVAC Plant
Standards & compliance
Built to the standards this work is inspected against.
Wording here is deliberate: we design and manufacture to these criteria.
Medical gasInstalled to IS 7396 and the criteria set out in HTM 02-01 for medical gas pipeline systems.
PipeworkDegreased medical-grade copper, brazed under inert gas, pressure-tested and purged before handover.
VentilationDucting and air changes designed to NBC Part 8 and the ventilation criteria for the clinical area served.
Corridor Ducting
Certificates held
Not what we design to — what we are audited for.
The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.
Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.
More than 1,00,000 sq. ft. across two units near Nashik. Fabrication, finishing and assembly stay under our control rather than being sub-let after award.
02
One contract to handover
Civil, furniture, gas lines and fire systems can run under a single order — one schedule, one site team, one signature at handover.
03
Built for inspection
Hospital work is measured and signed for. We build to the drawing and submit the supporting documentation with the bid rather than after it.
04
Pan-India delivery
Supply, installation and site support anywhere in the country, from a plant that has been doing government work since 2009.
FAQ
Questions we get on this scope.
If yours is not here, ask — we would rather answer it properly.
We pressure-test, purge and commission the system and hand over the test records with it. Third-party verification, where the contract calls for it, is arranged with the department rather than self-declared.
Oxygen, nitrous oxide, medical air and vacuum — the manifolds, the distribution pipework, the zone valves, the alarm panel and the terminal outlets.
Yes. Phased work in a live building is normal — the isolation, the sequence and the working hours are agreed with the department before we start.
It can be. Running gas and air together means one team is accountable for the ceiling void, which avoids two trades working around each other on the same route.
Send the tender number, the layout or the schedule of outlets. We reply within two working days.
Send us the drawing.
A tender number, a specification or a drawing set — we will confirm what we can build and by when, within two working days.