A bunk bed is the one piece of furniture with a safety standard behind it.
IS 17636:2021 exists because bunk beds fail in ways other furniture does not — guard rails, ladder fixing, the joint that carries the upper deck. We manufacture bunk beds under a BIS Standard Mark licence against that standard, certificate CM/L-7700298415, and that licence is the reason to buy them from us rather than from a fabricator working to a sketch.
The rest of the room comes from the same plants: wardrobes that take a term’s belongings, a study table that is actually usable, and the shoe rack that otherwise ends up as a pile by the door. One order, one programme, consistent finish across the block.
IS 17636 Licensed Bunk Beds
Room Wardrobes & Storage
Study Tables
Block-Scale Delivery
Single Hostel Bed
What we make
What we manufacture and deliver.
Any one of these can be contracted on its own, or the whole interior delivered under a single award against one drawing set and one schedule. Everything listed is manufactured, supplied and installed by us — not sub-let after award.
Hostel Bunk Beds
Two-tier beds manufactured under our BIS Standard Mark licence to the Indian Standard for bunk beds.
Manufactured under BIS licence CM/L-7700298415 to IS 17636:2021
Welded steel frame, powder-coated
Guard rail and ladder to the standard
Supplied flat-packed or assembled
Single Hostel Beds
Single-tier beds for rooms where a bunk is not needed or not permitted.
Single-tier steel bed frames
Powder-coated finish
Under-bed clearance for storage
Same frame construction as the bunk range
Room Wardrobes
Per-student storage sized for a term, lockable where the hostel requires it.
Single and shared room wardrobes
Hanging and shelved sections
Lockable configurations
Covered by our BIS licence to IS 17634:2022
Study Tables
A desk a student can actually work at, sized to the room rather than to whatever space is left.
Hostel room study tables
With or without shelving over
Covered by our BIS licence to IS 17633:2022
Sized to the room layout you send us
Shoe Racks & Room Storage
The small items that decide whether a hostel corridor stays clear.
Room and corridor shoe racks
Open shelving units
Powder-coated steel
Delivered with the room set rather than separately
Hostel Room Wardrobe
Standards & compliance
Built to the standards this work is inspected against.
Wording here is deliberate: we design and manufacture to these criteria.
Bunk bedsIS 17636:2021 — manufactured under BIS Standard Mark licence CM/L-7700298415, valid to May 2031.
Storage unitsIS 17634:2022 — manufactured under BIS Standard Mark licence.
Tables and desksIS 17633:2022 — manufactured under BIS Standard Mark licence CM/L-7700279520.
Quality managementISO 9001:2015, certificate BN22475/21523 — scoped to beds, tables, chairs and benches.
Green procurementFSC Chain of Custody for timber, licence code FSC-C221650.
Shoe Rack
Certificates held
Not what we design to — what we are audited for.
The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.
Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.
IS 17631Work chairs — ISI licenceBureau of Indian Standards · CM/L-7700279419
IS 17633Tables and desks — ISI licenceBureau of Indian Standards · CM/L-7700279520
IS 17636Bunk beds — ISI licenceBureau of Indian Standards · CM/L-7700298415
AIOTAErgonomics — education rangeAll India Occupational Therapists’ Association · AIOTA/ERG/C-206/2025-26
GreenProGreen product ecolabelConfederation of Indian Industry · GPFIP626001 – GPFIP626011 (product codes)
Four BIS Standard Mark licences against the Indian Standards for work chairs, tables, storage and bunk beds — product-level approvals with their own CM/L numbers, published with the numbers on them.
02
Assessed for ergonomics
The education range holds an Ergonomic Design and Performance assessment from the All India Occupational Therapists’ Association, certificate AIOTA/ERG/C-206/2025-26.
03
Rated for green procurement
A GreenPro Ecolabel from the CII, a GRIHA Product Catalogue listing and FSC Chain of Custody for timber — three separate registers a tender can check independently.
04
Made in our own plants
Steel forming, welding, powder coating, upholstery and assembly all happen across our two plants in Dindori, Nashik — so a campus order is one schedule and one delivery programme, not a chain of suppliers.
FAQ
Questions we get on this scope.
If yours is not here, ask — we would rather answer it properly.
Yes. We hold a BIS Standard Mark licence against IS 17636:2021, certificate CM/L-7700298415, valid to May 2031. That is a product licence with a number on it, not a claim that the design was drawn with the standard open — which is a distinction worth insisting on when you are buying beds children will sleep in.
That is the normal way we take this work. Beds, wardrobes, study tables and racks all come from our own two plants in Dindori, Nashik, so a block is one schedule and one delivery programme with a consistent finish — rather than four suppliers whose powder coat does not quite match.
Yes — most institutional orders are. Send the drawing, the room layout or just the quantities and the sizes you need. Where an item is a variation on a model covered by one of our BIS licences we will say so, and where it is a fresh design we will say that too, because the two are not the same thing on a tender document.
Either way. Flat-packed reduces the delivery footprint and is usually right for a large block; assembled is quicker to put into service on a smaller order or a mid-term replacement. Tell us which suits the site and the access.
Send the bill of quantities, the room schedule or the tender document. You get back a priced scope against your line items and a dated delivery programme, and we will tell you plainly if any part of it is outside what we manufacture rather than quoting it and buying it in later.
Send us the drawing.
A tender number, a specification or a drawing set — we will confirm what we can build and by when, within two working days.