Heavy steel fabrication and a pre-engineered building frame under erection

Service line 06 of 07

Precision Built. Site Ready. Always Reliable.

Pre-engineered buildings, heavy steel structures, platforms and industrial fabrication.

Finex Industries at a glance

Pre-Engineered Buildings (PEB) & Heavy Fabrication

What this covers.

A pre-engineered building is only as good as the tolerances it was cut to. We fabricate in our own plants, which means we control the cutting, the welding and the finish, and we can hold a delivery schedule without depending on somebody else's shop floor.

Everything on this page can be delivered on its own or folded into a single turnkey contract alongside our other service lines — one drawing set, one schedule and one signature at handover.

Twin-Bay PEB Structure — Pre-Engineered Buildings (PEB) & Heavy Fabrication
Twin-Bay PEB Structure

Scope

What we deliver.

Manufactured, supplied and installed by us against the approved drawing set for your contract — not sub-let to a third party after award.

  • 01

    Pre-engineered building design, supply and erection

  • 02

    Heavy structural steel fabrication

  • 03

    Industrial platforms, walkways and staircases

  • 04

    Roofing, cladding and insulation systems

  • 05

    Mezzanine floors and support structures

  • 06

    Site erection and alignment

PEB Frame Under Erection

How it gets built

From requirement to delivery.

The same four stages on every contract, so you always know what has been approved, what is in the plant and what is still open.

  1. 01

    Understand the Requirement

    We begin by understanding the project requirements, site conditions, specifications and expected outcomes before moving into execution.

  2. 02

    Design & Plan

    Drawings, materials, specifications and execution plans are developed and reviewed to establish a clear path from concept to manufacturing.

  3. 03

    Manufacture & Execute

    Fabrication and manufacturing are carried out at our facilities with quality checks at key stages, followed by controlled site execution.

  4. 04

    Deliver & Handover

    Installation, commissioning, testing and documentation are completed before final handover, with support through project completion.

Certificates held

Not what we design to — what we are audited for.

The certificates from our register that apply to this work, each with its issuing body and certificate number. Nothing here is a claim we have not been audited for.

Certificates held Not what we design to — what we are audited and licensed for, with the certificate number on each.

  • ISO 9001 Quality management BSCIC Certifications Pvt. Ltd. · BN22475/21523 Rev.01
  • ISO 45001 Occupational health & safety
  • ISO 14001 Environmental management
  • ZED Gold Zero Defect Zero Effect — Gold Ministry of MSME · assessed by Conformity India International Pvt. Ltd. · 14072025_402233
  • MSME Lean Lean manufacturing, basic level Ministry of MSME · LB_20250721_16579
All 20 certificates, with issuing bodies and validity dates

Questions

What buyers ask us first.

PEB design, supply and erection; heavy structural steel fabrication; industrial platforms, walkways and staircases; roofing, cladding and insulation systems; mezzanine floors and support structures; and site erection and alignment. Six sub-service areas sit under it, from industrial sheds and warehouse structures to structural engineering.

Yes — site erection and alignment is part of the published scope, and it is the point of buying a building from the organisation that fabricated it. The alternative is a fabricator, an erector and an argument about which of them owns a misaligned bay.

The design basis for a PEB is set by the tender: the load cases, the code and the site conditions come with the drawing set, and we design and fabricate to what is issued. If you want the codes and load assumptions confirmed for a specific enquiry before you shortlist, ask and we will state them for that scope in writing.

ISO 9001 for quality management, ISO 45001 for occupational health and safety, ISO 14001 for environmental management, MSME ZED Gold, and the MSME Lean Manufacturing Competitiveness Scheme at basic level. Every certificate number, issuing body and validity date is on the certifications page.

Send the drawing set, the bill of quantities or just the tender document. We come back with a priced scope and a dated programme against your milestones, and we will tell you plainly if any part of the scope is outside what we manufacture rather than quoting it and sub-letting it later.

Need Pre-Engineered Buildings (PEB) & Heavy Fabrication?

Tell us the scope and the deadline. If it is something we build, you will get a straight answer and a realistic date.

Call Now WhatsApp